Decommissioning and dismantling require site-specific strategies, precise planning and a consistent focus on safety and radiation protection.
Discuss the project on the decommissioning and dismantling of nuclear facilities
The decommissioning and dismantling of a nuclear power station are complex tasks that require plant-specific planning and close integration of engineering, radiation protection and regulatory requirements. Every nuclear facility has its own specific conditions, which must be systematically taken into account during the decommissioning process. The aim is to organise the transition from active operation to safe and transparent waste management in a structured manner.
DMT supports operators and the responsible authorities in the planning and implementation of these challenging tasks. Drawing on our expertise, we support projects from strategic preparation through to the coordination and optimisation of processes, right through to technical support during the various decommissioning phases. Our focus is on safety, efficiency, regulatory compliance and robust technical implementation.

A successful decommissioning programme begins with structured planning that brings together technical, organisational and regulatory requirements. DMT provides support in developing viable concepts and in the technical preparation of all key project phases.

The decommissioning of nuclear facilities involves numerous interlinked processes. DMT provides support in coordinating and optimising these processes in order to clearly manage interfaces and ensure the project runs efficiently.

Radiation protection is a key area of focus throughout all phases of decommissioning and dismantling. DMT develops radiation protection concepts, provides support with their implementation and ensures they are continuously adapted to reflect the project’s progress.

The management of residual materials and radioactive waste is an essential part of decommissioning. DMT provides support in planning safe and traceable solutions for separation, handling and packaging.

Decommissioning and dismantling take place within a challenging regulatory environment. DMT provides support in ensuring that statutory requirements and safety standards are incorporated into the planning and implementation stages at an early stage.

Nikolai Hentrich
Nuclear Engineering
+49 160 888 4647

Every nuclear facility has specific technical, operational and radiological characteristics. Decommissioning plans must therefore be developed on a facility-by-facility basis in order to ensure that safety requirements, process flows and waste disposal routes are reliably coordinated.
Radiation protection is an integral part of the entire decommissioning process. The requirements regarding measures, monitoring and organisational procedures vary depending on the phase. For this reason, radiation protection plans must be continuously adapted and integrated into operational procedures.
Yes. DMT provides support in managing residual materials, planning the packaging of radioactive waste and integrating these tasks into overarching disposal and documentation strategies.